Snells Beach Rising Main Installation

IMG_5355.JPG

Client
March Cato/Watercare

Sector
Sewer

The project involved the installation of 270m of 630mm PE pipe to a tight grade by directional drilling. Sandy silt ground conditions made the job difficult which caused the excavations and drill hole to collapse at times. Despite this, the project was completed on time and within budget.